January 2014: North Fort Myers, FL – Demo of a drop in jetted tub, wall tile & floor tile made way for an updated bathroom. This remodel consisted of moving the tub drain to accommodate a 4’x3′ shower. New baseboards, tile, bathroom fixtures & toilet were installed. Installment of a pocket door frame & door replaced the existing swinging entry door.
Scheduled for Completion: February 2014