Search
Close this search box.

January 2014:  North Fort Myers, FL – Demo of a drop in jetted tub, wall tile & floor tile made way for an updated bathroom.  This remodel consisted of moving  the tub drain to accommodate  a 4’x3′ shower.  New baseboards, tile, bathroom fixtures & toilet were installed.  Installment of a pocket door frame & door replaced the existing swinging entry door.

Scheduled for Completion:  February 2014

Similar Projects

Tell us about your project